1. What is the Inspection & Test Plan (ITP)?
Answer: A mandatory item in the quality plan that guides and assures quality in a specific type of work through a sequence of quality control activities.
2. What is a Quality Control Procedure?
Answer: A document that details specific steps needed to fulfill the quality control activities outlined in the ITP.
3. What is a Quality Control Form?
Answer: A written documentation detailing a specific activity in the ITP and Quality Control Procedure.
4. What references will be found in an ITP?
Answer: Standard procedures, codes, and specification references.
5. What is a Specification?
Answer: A guideline to ensure the minimum quality standards are met.
6. What are the 4 types of inspection action points found in the ITP?
Answer: Hold, Witness, Surveillance, Review.
7. What is the minimum design compressive strength for structural concrete at 28 days curing?
Answer: 4000 psi.
8. Calibration of instruments, gauges, and test equipment should not exceed how many months?
Answer: 6 months.
9. What is the required minimum base of trench on either side of the pipeline?
Answer: 300 mm.
10. Asphalt surface regularity and thickness of the stabilized layer shall not show any deviation in excess of how many mm when tested with a 3m straight edge?
Answer: 6 mm.
11. Compaction by water jetting or flooding is only permitted if the fill material is cohesionless and freely draining. What is such material?
Answer: Sand.
12. What is the required compaction test percentage for base course materials and sub-base materials, respectively?
Answer: 95% to 100%.
13. What is the minimum required time for a moisture test after the concrete is ready for coating?
Answer: 16 hours.
14. What is the required temperature of grout on-site?
Answer: 23°C ± 3°C.
15. For pipelines, what is the maximum allowable unsupported length before backfilling?
Answer: 3 meters.
16. What is the setting time of concrete after the introduction of mixing water to the cement and aggregates?
Answer: 90 minutes or 1½ hours.
17. What is the required asphalt temperature on-site?
Answer: 139°C to 163°C.
18. Asphalt tolerance in thickness: Measurement of any core shall not be deficient by more than 10 mm or what percentage of the design thickness, whichever is less?
Answer: 15%.
19. What is the maximum allowable total dissolved solids in water used for curing concrete?
Answer: 1000 parts per million (ppm).
20. Key Takeaways for OC Interviews:
- Be familiar with ITP, Quality Control Procedures, and Forms.
- Understand specifications, standards, and codes relevant to the project.
- Know the technical requirements for materials like concrete, asphalt, and pipelines.
- Be prepared to explain inspection action points and their significance.