HG Infra Engineering Limited is a construction company. It is known for its quality performance and growth in the past few years. The company is taking up several projects regarding the highways, metro, and railways. Running successfully for two decades, the company had its major win of the Delhi Metro Magenta Line Contract a year ago. We will be unveiling the details of HG Infra Engineering Limited’s upcoming projects and its expected salary below.

WhatsApp Group Join Now
Telegram Group Join Now

What Is HG Infra Engineering Limited?

HG Infra Engineering Limited is a construction company responsible for building major highways, metro and railway lines etc. If we talk about its major projects, it created the Gurgaon-Sohna highway, Rewari PKG-4, Delhi Vadodara PKG 4, and Rewari-Ateli Mandi PKG 03. The company has several ongoing projects as well. It includes the Ganga Expressway (Uttar Pradesh) as its major project. It is 26.60% completed till now and has a cost of Rs. 412.11 Crores. It is running under the Delhi Metro Rail Corporation (DMRC) intending to complete in the next two years. Let us look at its other ongoing and upcoming projects below.

HG Infra Engineering Limited Ongoing And Upcoming Projects

Top 3 HG Infra Engineering Limited ongoing projects:

  1. Karnal Munak Road (Haryana): The project is a 6-lane construction of a ring road from NH44 Near Shamgarh Village to Samalakha Village. It will cost Rs. 997.11 Crores spreading to 34.5 Kms. The project is running under the National Highways Authority of India (NHAI).
  2. Neelmangala -Tumkur (Karnataka): The project costs Rs. 844.11 Crores and has been completed 15.60% till now. It is running under NHAI and will construct a 6-Lanning including the Tumkur Bypass Section NH48.
  3. Raipur-Visakhapatnam OD-6: This project is half completed. It is a six-lane development for the Baunsaguar-Baraja Section of NH-130-CD road from km 293+000 to km 338+500 under the Ripur-Visakhapatnam Economic Corridor in Odisha. It will cost Rs. 1123.11 Crores.

Top 3 HG Infra Engineering Limited Upcoming Projects:

  1. Gujarat Road Upgradation Project: The company announced on 20 August 2024 its brand new project of existing six-lane road upgradation in Gujarat. It will include the elevated corridor from Narol Junction to Sarkhej Junction and cost Rs. 781.11 Crores after the bid.
  2. Gaya-Son Nagar PKG-4: It will be commissioned under East Central Railway including the construction of double line track formation including earthwork, blanketing, and minor bridges. The project’s LOA date was 12 March 2024 costing Rs. 709.11 Crores.
  3. Chennai-Tirupati Package-II: The project’s letter of acceptance date was 11 March 2024. It will cost Rs. 862.11 crores commissioned under NHAI and is ongoing in Andhra Pradesh. Stay tuned for more information on our website.
WhatsApp Group Join Now
Telegram Group Join Now

3 thoughts on “HG Infra Engineering Limited 2024 Ongoing And Upcoming Projects Details”

    • Dear sir
      Iam having more than 24+y, projently iam working in Development of Six-Lane Access Contrilled GreenfieldbHighway from BKV package 13
      Position Dy, project manager (Highways)
      Id – gun.gnu977@gmail.com
      Cell no – 9000039011

      Reply

Leave a Comment