What Are KRC Infraprojects Pvt. Ltd.’s Ongoing Projects and Salary Expectations?

KRC Infraprojects Pvt. Ltd. stands as a prominent name in the construction and infrastructure development sector, specializing in the construction of highways, bridges, tunnels, and airport systems. The company has collaborated with esteemed organizations such as the National Highways Authority of India (NHAI) and the National Highways and Infrastructure Development Corporation Limited (NHIDCL). Founded in 2001 by Mr. Kanhi Ram, KRC Infraprojects has steadily built a reputation for excellence and reliability. Below, we delve into the details of the company’s ongoing projects.

WhatsApp Group Join Now
Telegram Group Join Now

KRC Infraprojects Pvt. Ltd. Ongoing Projects

KRC Infraprojects Pvt. Ltd. is working on the following projects:

  1. Construction of High Attitude Hill Road from Dembuen to Bruni from km 0.000 to 36.300 km in Anini District of the State of Arunachal Pradesh on EPC mode.
  2. Construction of a 6-lane access-controlled Greenfield highway from km 67+000 to km 99+000 of Rajasthan/Gujarat Border to Santapur section of NH-754K as a part of Amritsar-Kamnagar Economic Corridor in the state of Gujarat on EPC mode under Bharatmala Pariyojana in Gujarat.
  3. Balance Work of four Lanning of Gwalior Shivpuri from Existing Ch. 215.000 to Existing Ch. 221.500 Section of NH3 Passing through Madhav National Park in MP on EPC Mode in Madhya Pradesh.
  4. Development of six-lane access-controlled highway of Daat Kali tunnel Dehradun of GaneshpurDehradun section of NH72A from km 16.380 to km 19.785 Design Chainage in Uttarakhand under Haratmala Pariyojana on EPC mode Package 3 in Uttrakhand.
  5. Construction and Upgradation of Ditte Dimmemiggung road to 2-Lane with hard shoulders under project Brahmank in the state of Arunachal Pradesh on EPC Mode.
  6. Construction of 3-lane new ROB at existing km 373+230 including widening, construction of VUP at existing km 373+190 & ramps at LHS & RHS
  7. Construction and degradation of Ditte Dimmemigging road (Design Chainage from km 152.81 to km 173.34 and existing chainage from km 167.10 to km 189.1) to 2-lane with hard shoulders under project Brahmank in the state of Arunachal Pradesh on EPC Mode Pack-4.
  8. 4 landing of Amritsar Bypass GA from New Tarn Taran road-Ajnala Road from km 0.750-km 43.750 and degradation of existing Amritsar-khemkaran road to 4-lane config from Design km. 71.496-km 78.440 total 49.944km PKG-3 in Punjab under BMP on EPC mode.

KRC Infraprojects Pvt. Ltd. Salary Expectations

KRC Infraprojects Pvt. Ltd. has the following salary expectations:

  1. Assistant Structural Engineer: from Rs. 2.1 Lakhs per annum to Rs. 3 Lakhs per annum
  2. Store Incharge: from Rs. 2.2 Lakhs per annum to Rs. 3.7 Lakhs per annum
  3. Senior Quantity Surveyor: from Rs. 9.6 Lakhs per annum
  4. Accountant: from Rs. 3.8 Lakhs per annum to Rs. 4.2 Lakhs per annum
  5. Civil Site Engineer: from Rs. 2 Lakhs per annum to Rs. 5 Lakhs per annum

Read Also:

KCC Buildcon Pvt Ltd: Which Projects Highlights The Company’s Expertise?

What Fresh Graduates Can Anticipate At BL Kashyap & Sons Ltd?

RKC Infrabuilt Pvt Ltd Projects 2024 Details: What Are The Salary Expectations For Freshers?

Patel Infrastructure Ltd: Key Specifications And Salary Insights For Job Seekers

LCC Projects Pvt Ltd Salary Expectations And Project Insights

Who Is Apco Infratech Pvt Ltd Owner? How The Company Started?

What Are KRC Infraprojects Pvt. Ltd.'s Ongoing Projects and Salary Expectations?
WhatsApp Group Join Now
Telegram Group Join Now

Leave a Comment