MKC Infrastructure Limited is a pioneer in road and bridge construction. Starting from 2009, the company has been successfully operating in its field. MKC Infrastructure started with a strong foundation in Gujarat. However, it now has a presence in other states as well. Road construction, bridge construction, industrial buildings and civil engineering projects are the foundation and main services of MKC. It has also received awards for its quality performance, timely project completion, and innovative approach. MKC focuses on infrastructure sustainability as well. Let’s take a look at the company’s innovative projects and job opportunities.
MKC Infrastructure Limited Job Roles And Expected Salaries:
MKC Infrastructure Limited has the following salaries and job roles as per the ambition box survey:
- Executive Accountant: from Rs. 2 Lakhs to Rs. 4.2 Lakhs per annum
- Highway Engineer: from Rs. 1.9 Lakhs to Rs. 4.9 Lakhs per annum
- Junior Engineer: from Rs. 1.5 Lakhs to Rs.4 Lakhs per annum
- Civil Site Engineer: from Rs. 1.4 Lakhs to Rs. 4.8 Lakhs per annum
- Senior Engineer: from Rs. 4 Lakhs to Rs. 7.8 Lakhs per annum
- Junior Engineer Civil: from Rs. 1.7 Lakhs to Rs. 3 Lakhs per annum
- Mechanical Engineer: from Rs. 2.4 Lakhs to Rs. 4.8 Lakhs per annum
- Civil Engineer: from Rs. 2 Lakhs to Rs. 3.6 Lakhs per annum
- Accountant: from Rs. 2.1 Lakhs to Rs. 6.2 Lakhs per annum
- Planning & Billing Engineer: from Rs. 2.7 Lakhs to Rs. 5.5 Lakhs per annum
MKC Infrastructure Limited Current Projects
MKC Infrastructure’s current projects are as follows:
- Border Road: Construction and improvement of road Bakhasar Mavasari from km 0+000 to 32+490 design length 31,703 km from existing CL 9 specifications to NHDL specifications under 45 BRTF of project Chetak in Rajasthan and Gujarat state in EPC Mode.
- Greater Ring Road: Construction of 6-lane Indore Western bypass from km 34+000 to km 64+000 (pkg-II) in the state of Madhya Pradesh under NH(O) on Hybrid Annuity Mode Projects.
- Construction of 6-lane Indore western bypass from 0+000 to km 34+000 (pkg-I) in the state on Hybrid Annuity Mode under NH(O).
- Railway: Construction of new line between new Modsa (MDSA) at take-off point at km:99 (from Nadiad) Chaiange ch.: 0.00 m to Shamlaji Road (SJS) at ch.: 26595.40m covering all Civil Engineering works (i.e. Earthwork, Blanketing, Side Drains, Retaining Wall, Construction of important bridge, all major/minor bridges, RUBs / LHA, Level crossings, complete track works, Ballast Supply and other Civil Engineering Works).
Stay tuned for more information.
Read Also:
KCC Buildcon Pvt Ltd: Which Projects Highlights The Company’s Expertise?
What Fresh Graduates Can Anticipate At BL Kashyap & Sons Ltd?
RKC Infrabuilt Pvt Ltd Projects 2024 Details: What Are The Salary Expectations For Freshers?
Patel Infrastructure Ltd: Key Specifications And Salary Insights For Job Seekers
LCC Projects Pvt Ltd Salary Expectations And Project Insights
Who Is Apco Infratech Pvt Ltd Owner? How The Company Started?