Ravi Infra New Project 2024: Read More Details

Ravi Infrabuild new projects are becoming a good source of income for the company. It deals with the construction of civil engineering projects. The company started in February 2009 and is expanding further. Ravi Infrabuild has decades of experience in the field of infrastructure. It is a field with much scope in the coming years. As PM Modi introduced the infrastructural development in the coming years, the demand for the company is increasing every day. Let us look at Ravi Infra New Projects 2024 below.

WhatsApp Group Join Now
Telegram Group Join Now

What Is Ravi Infra About?

Ravi Infrabuild Projects Private Ltd is a private company that deals in the construction of highways, railways, and other urban developmental infrastructure. It has more than 15 years of expertise in their field. Thus, it opens up a lot of opportunities for everyone in the field. Ravi Infrabuild started its journey from Udaipur, Rajasthan. It identified the need to have a company in infrastructure that can deliver quality. It is now providing jobs in the fields of storekeeper, civil site engineer, senior structural engineer, asst. store, QA QC engineer, Assistant Manager, Senior Engineer, and many more. Following are details about Ravi Infra New Projects 2024.

Ravi Infra New Projects 2024

Ravi Infra new projects are as follows:

  1. Development and Maintenance of Ropeway from Nature Park to Bijli Mahadev Temple in District Kullu, Himachal Pradesh. It has a total cost of Rs. 273.84 Crores and will be completed in 24 months.
  2. Construction of Limited Height Subways in lieu of level crossings in Chittaurgarh, Udaipur section in connection with the elimination of existing level crossing gates. The project cost Rs. 40.41 crores and will be completed in 18 months.
  3. Construction of Limited Height Subways in lieu of crossings in the Ajmer-Chittaurgarh section in connection with the elimination of existing level crossing gates. It has a total cost of Rs. 23.62 Crores with an 18-month completion period.
  4. Construction of 2 lane Road over Bridge in lieu of LC no. 72 at km 107/7-8 near Degana station yard has a single clear span of 1*36m. Composite steel Girder in railway portion. It will cost Rs. 29.62 Crores with 18 months of completion period.
  5. Widening to 2 lanes with paved shoulder from km 0.00 to 102.3 of Nh 548B. i.e., Murum-IB circle Section in the state of Karnataka on EPC mode.
  6. Construction of Four four-lane highways from Gujarat-Ballia UP-Bihar State Border section of NH-31 Package I from Hridaipur to Shahaour on EPC Mode in UP.

Read Also:

HG Infra Engineering Limited 2024 Ongoing And Upcoming Projects Details

Patel Engineering New Projects 2024 Details: Know Which Projects Is The Company Working On?

Kalpataru Projects International Limited 2024: What Income A Fresher Can Expect In 2024?

Megha Engineering And Infrastructure Limited Current Projects Details

Tata Consultancy Services News And Latest Updates

GR Infra Projects Limited 2024: What Salary A Fresher Can Expect In The Company?

WhatsApp Group Join Now
Telegram Group Join Now

Leave a Comment